Project Name: Execution of the Additional Rehabilitation Works under Polder Nos. 41/6B, 41/7B, 39/2A and 52/53B in Barguna and Patuakhali Districts under Emergency 2007 Cyclone Recovery and Restoration Project

Executing Authority: Bangladesh Water Development Board (BWDB)

Funding Authority: BWDB & World Bank

Salient Features:

  1. Re-sectioning Embankment
  2. Retired Embankment
  3. Construction of Sluices
  4. Construction of Box Outlets
  5. Repairing & Replacement Vehicle Lift Gate, Flap Gates, Lifting Device, Pedestal Type Lifting Device
  6. Bank Protection with Hard Rock, Geo Bag and CC Blocks
  7. Slope Protection with CC Block