Bridge

Bridge Works

Successful execution and challenging bridge work. MAX is the first Bangladeshi private company who has constructed big girder bridge steel truss designed, fabricated and erected by MAX team and associates.

 Girder Bridge (23)

 

Baily Bridge

Construction of pile cap at 10 meter depth under water, a single pile cap casting consist of 500 cubic meter concrete, executed by MAX team.

Baily bridge2

 

Cofferdam Works

 

 

MAX constructed the highest 10 meter under water pile cap and pier successfully under close supervision of in house engineering team using own equipments.

co500